Steam Turbine problems & solutions

Bibek Roy

By Bibek Roy

Chartered Engineer, Power plant expert, BEE Certified Energy auditor, CII Certified carbon Foot Print auditor, Lead auditor EHSMS & ISO 9001, Environmentalist

Are you facing following problems in your steam turbine?

  1. High exhaust steam temperature
  2. Hot well condensate high temperature
  3. Not achieving correct vacuum corresponding to turbine load
  4. Deteriorating condenser vacuum
  5. High Terminal Temperature Difference (TTD)

If any one or more of the above problems you are facing, please check immediately following:

  1. Colling tower outlet colling water temperature is correct?
  2. Side stream filters of cooling tower are functioning correctly?
  3. Langelier Saturation Index (LSI) is between 0.6 to 1.2? This will give an idea of the internal condition of condenser tubes.
  4. Condenser colling water valves are in full open condition? – If necessary, carryout a flow measurement at inlet and outlet of the condenser.
  5. Are cooling water pumps having correct speed, input power parameters and correct discharge pressure? – If necessary, carry out flow measurement for each pump.
  6. Are cooling water pumps been overhauled on time?
  7. All air ingress points are blocked and being checked in regular intervals?
  8. Steam ejectors or vacuum pumps are working correctly?
  9. Have you done recommended servicing/overhauling for ejectors/Vacuum pumps?
  10. Is condenser online tube cleaning system in working condition? And there is no considerable ball loss from the system.

In my 36 years of experience in various Coal based & Gas based power plants, I have seen some practical failures due to non-availability of proper check list.

Even condersor outlet line's cooling water valve was found closed after approx 2 years of operation though valve actuator indication was showing OPEN!!

I hope this will helpyou to trace out the above problems and help you to HEAT RATE reduction and ENERGY INTENSITY reduction.

As we march forward towards reversal of GLOBAL WARMING, we have to use less and less fossil fuel consumption and to reduce HEAT RTAE and make ENERGY EFFICIENCY as the main pillar for energy reduction and COST REDUCTION.

Bibek Roy
An experienced power plant professional having more than 34 years of experience in India & abroad. Certified Lead auditor for QMS, EHSMS. Certifed Energy auditor from BEE. A trainer, coach and auditor. An evangelist for sustainability.

READ THeSe NEXT

June 25, 2024
Trigeneration plants can be game changer for energy efficiency

Introduction: In the of era of high energy efficiency and sustainability whole world is searching most energy efficient technologies. In this connection all industries have lot of choices, like use of cleaner technologies, CCUS (Carbon capture use & storage), Renewable Energy integration (RE integration) and obviously using low quality heat for chillers & refrigeration. Trigeneration […]

Read More
June 6, 2024
Double Energy Efficiency With VARS

Vapour Absorption Refrigeration System (VARS) opened up an avenue for enhancing energy efficiency. This system is using low quality heat from the process. In thisn process heat lossess are minimized.

Read More
April 8, 2024
3 - MAJOR PROBLEMS IN STEAM TURBINE CONDENSERS

The steam surface condenser is the largest heat exchanger in a power plant. Hence the quality of the tubing within the condenser is critical for reliable operation of the plant. Steam turbine condensers play a critical role in the efficiency and performance of power plants, particularly in steam power generation. However, they are not without […]

Read More

Leave a Reply

Your email address will not be published. Required fields are marked *

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram